An office relocation, reinstatement, or lease handover is easier to manage when the cleaning scope is 已同意 before the work is scheduled. This guide helps office tenants, workplace teams, and project coordinators prepare a clear brief for the relevant parties.
Use this as a 规划中 checklist. The final cleaning scope, timing, 访问 arrangements, and quotation should be 已同意 with the building, project team, and appointed 服务 provider.
1. Confirm the Handover 情境
Start with the practical details that shape the work. Record the intended handover date, the available 访问 window, the contact for building management, and whether the office is being vacated, occupied, fitted out, or prepared for a new team.
- 已计划 handover, move-out, or move-in date
- 楼宇出入 hours, loading arrangements, and any booking process
- 区域 that are part of the office demise and any shared areas outside it
- Existing furniture, fixtures, equipment, and materials remaining on site
- Relevant landlord, building-management, or project requirements supplied to the tenant
A useful brief identifies spaces rather than relying on a general request for an office clean. List the areas that need attention and note any finishes or 项目 that require a particular approach.
- 办公室 workspaces: desks, screens, cabinets, partitions, and accessible floor areas
- 会议室: tables, chairs, internal glass, presentation areas, and AV-adjacent surfaces
- Pantry and refreshment points: countertops, sinks, appliances, storage fronts, and waste areas
- 洗手间: fixtures, mirrors, accessible wall surfaces, and consumable responsibility
- 接待处 and circulation areas: entry glass, soft seating, floor finishes, and visitor-facing surfaces
- Storage or back-of-house areas: 访问 restrictions, retained 项目, and what should be removed separately
清洁 is often coordinated alongside furniture removal, minor repairs, reinstatement, IT decommissioning, and waste collection. Make the boundaries clear so that each party understands what is included in their own work.
For example, agree who is responsible for removing unwanted furniture, confidential paperwork, electrical 项目, consumables, and construction debris. If any marks, adhesive residue, stains, or finish damage need specialist review, identify them in the brief rather than assuming they form part of a standard scope.
4. Agree 出入, Timing, and Working Conditions
The cleaning programme should reflect the office’s actual 访问 conditions. Confirm how personnel enter the premises, where equipment and materials can be staged, and whether work must take place outside occupied hours.
- Named site contact and escalation contact
- 楼宇出入 cards, keys, or escorted-访问 requirements
- Lift, loading-bay, and waste-disposal arrangements
- Approved working hours and any restricted periods
- Water and power availability where relevant to the 已同意 scope
Where appropriate, take dated photographs of the areas being handed over and share them with the relevant project or property contacts. This helps distinguish pre-existing condition issues from tasks included in the 已同意 cleaning scope.
Note any damaged finishes, loose fixtures, water staining, 访问 constraints, or areas that cannot be safely reached. These 项目 may require separate instruction or review.
6. Plan the Close-Out 审查
Before the handover date, agree who will review the completed work and how feedback will be handled. A short walk-through can help ensure that any final presentation points are identified while the relevant parties still have 访问 to the 办公室.
The close-out process can include an 已同意 completion checklist, photographs where requested, and confirmation of any follow-up 项目. It should not replace a landlord, building-management, or project inspection where one is required.
Questions to Ask Before Requesting a Quotation
- Which areas are included, and which are excluded?
- Is the office occupied, vacant, under fit-out, or being reinstated?
- What 访问 window is available?
- Who will remove furniture, waste, and retained 项目?
- Are there specific finishes, internal glass, carpets, or pantry areas that need to be noted?
- Who will be available for the final walk-through?

















